Project Profiles

Marinette Marine Corp - Building 10

Marinette Marine Corp - Building 10

Overview

  • 79,204sf addition to existing facility.
  • Addition completed without interrupting shipbuilding operations at MMC.
  • Addition was completed by building around a Naval Vessel under construction by MMC.
  • The time from construction start to building enclosure was six months.
  • The time from construction start to substantial completion was 9.5 months.
  • The addition included three upper levels that included interior offices as well as improvements & updates made to the existing building.
  • The Building houses (8) 50 Ton cranes which have the ability to go outside the East end of the building.

Smet Advantage

http://www.youtube.com/watch?v=F7bDJP5K7oI

Share this post