Overview
- Supplied and installed a new 3000 amp electrical service to the ship launch site for shore power to LCS and other vessels under construction.
- Constructed a shore power house where the ships can plug in for power.
- This project was completed during normal Marinette Marine manufacturing operations without disrupting or disturbing their operations.
- Supplied & Installed (6) 400 amp receptacles for the shore power.
- This process crossed over/under numerous existing utilities in the work areas.